Static Line attachment
What 'knots' do you use to secure your static lines to the anchor point...when you cant attach your breakcord directly to the anchor point. I usually larkshead a one piece strop to the anchor point rather than using an open ended piece of rope/material
The last S/L I did using an open ended piece of climbing rope as the S/L, on collecting the S/L later... I noticed the knots (surgeons and mulitple overhand knots).. had 'slipped' a little....not a lot...but enough to get me thinking.
What knots do you use?