1. Land use (Zoning/Permits) Do you have setback requirements and can you meet them so that when it falls over it doesn't land in your neighbors yard? This process could cost a couple thousand or the sky is the limit depending on if the jurisdiction requires NEPA studies,wetland studies, ect ect ect.
2.Geotechnical drilling for foundation design 4+K
3.Foundation design 3K
4.New Anchor Bolts turned 4k??
5.Foundation...Drill and pour w/ caison cages included ...hmm Im gonna guess 25k+ ...depends on the bore log from the geotech.
6.Tower erection can be from 30 to 50K+ depending on method used. Gin pole or conventional/hydraulic crane.
Is your back yard big enough to lay out all that steel?
7.FAA registration and lighting kit 5K.
8. Safety climbs for all your buddies @ 225$ a peice
having your own personal tower? priceless!